Estimator/Change Order Specialist
Company: Paxon Energy & Infrastructure Services LLC
Location: San Diego
Posted on: May 1, 2025
Job Description:
Estimator/Change Order Specialist
COMPANY DESCRIPTION: Paxon Energy, the leading force in the energy
industry and 9th fastest growing company in the U.S., is driven by
our unwavering commitment to sustainable solutions and exceptional
services. With a collaborative and inclusive culture, Paxon fosters
personal and professional growth, empowering individuals to be
innovative and make a meaningful impact in shaping the future of
energy as well as unlocking their full potential contributing to
transformative projects and working alongside industry experts.
Join Paxon and become part of a dynamic team dedicated to driving
positive change in the world. JOB TYPE: This will be a mid-term
position for 20-40 weeks with a potential to become a full-time
position. "This job is contingent upon contract award. We are
positioned for imminent award and are gearing up for dynamic
project execution." LOCATION: San Diego, CA - On site. Expect to be
working out of a job site trailer for the duration of this project.
COMPENSATION: $100k - $130k Salary; Exempt. Note: This is a
starting point and may differ based on the successful candidates'
interview and years of experience. POSITION SUMMARY: As the
Estimator/ Change Order Specialist, you will be responsible for the
direction and preparation of lump sum, unit rate and cost-plus
industrial construction cost estimates ranging from simple cost
analysis to definitive estimates in support of proposals, project
controls, prime contractor and subcontractor submittals and project
change orders. You will be working at an advanced Water Treatment
Facility under the San Diego Pure Water Program.
What you will be responsible for: (Disclaimer: The lists below are
not all inclusive)
- Review contractual documents (specifications, ECN's, contractor
RFI's) and determine contract modifications scope changes and their
applicable cost.
- Prepare clear detailed quantity takeoffs for specified scopes
of work to assist Construction Manager, CM Advisor and Team
members.
- Prepare estimate details and summary using estimating software;
tabulating materials, process equipment, construction equipment,
labor, OH&P
- Obtain commercially available cost pricing from vendors,
manufacturers, suppliers, and trade representatives.
- Ability to work under a variety of timelines, establishing
priorities to meet project deadlines.
- Advanced ability to interpret Project Specifications with
multiple Code references.
- Calculate the cost of a TIA within base contract and congruent
contract changes orders.
- Review Contractor and Subcontractor change order cost
proposals.
- Assist in negotiation of change order costs. What you will be
responsible for: (Continued)
- Provides technical advice and assistance to the Field
Construction Manager, Deputy CM and CM Advisors in the preparation
of all levels of estimates ranging in scope and complexity from a
simple factored or curve type analysis estimate to extremely
complex mechanical and electrical changes.
QUALIFICATIONS: You must have the following: (Minimum)
- Minimum 8 years of experience in cost accounting and scheduling
in water management, 5 years of direct or relevant experience
without a bachelor's degree.
- Pass a background check, drug screen, motor vehicles records
search.
If you have the following it would be a big plus: (Preferred)
- BS or MS graduate in Construction Management or related
field.
- Preferred Skills:
- Complex estimating principles and practices including
conceptual estimating.
- Cost engineering.
- Mathematical, Consulting, Planning, Analytics.
- Interpret and understand specifications and contracts.
- Software Skills: Ranging from Microsoft Office Suite to PMIS
Procore to Estimating Timberline or similar.
- Advanced verbal and written communication and interpersonal
communication skills.
- Preferred Accreditations, one of the following:
- AACE International
- CCP (Certified Cost Professional)
- CEP (Certified Estimating Professional)
- American Society of Professional Estimators CPE (Certified
Professional Estimator)
- Preferred Database Experience, one of the following:
- RS Means
- Richardson Cost Data
- NECA Labor Units
- MCAA Labor Calculator If you have the following it would be a
big plus: (Continued)
- Preferred Estimating Experience in Facility Electrical Service
discipline plus any of the following:
- Instrumentation and Control
- Heavy Mechanical and Process Piping
- Facility Civil/Structural BENEFITS: Paxon offers a
comprehensive package of Medical, Dental, Vision, 401K, Life
Insurance, and many more! We are committed to providing a
diversified workforce for our clients:Paxon Energy & Infrastructure
is committed to creating a diverse environment and is proud to be
an Equal Opportunity Employer. We invite resumes from all
interested parties including women, minorities, veterans, and
persons with disabilities. All qualified applicants will receive
consideration for employment without regard to their protected
veteran status and will not be discriminated against based on
disability.
Compensation details: 100000-130000 Yearly Salary
PI675feb6dd30d-37248-37431359
Keywords: Paxon Energy & Infrastructure Services LLC, El Centro , Estimator/Change Order Specialist, Professions , San Diego, California
Didn't find what you're looking for? Search again!
Loading more jobs...